Triple

T15560571
Position Surface form Disambiguated ID Type / Status
Subject Snowy Hydro Limited E370985 entity
Predicate operates P24 FINISHED
Object Snowy Mountains Hydroelectric Scheme E67510 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Mountains Hydroelectric Scheme | Statement: [Snowy Hydro Limited, operates, Snowy Mountains Hydroelectric Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy Mountains Hydroelectric Scheme
Context triple: [Snowy Hydro Limited, operates, Snowy Mountains Hydroelectric Scheme]
  • A. Snowy Hydro Scheme chosen
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • B. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • C. Gordon–Pedder hydroelectric scheme
    The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
  • D. Bridge River Power Project
    The Bridge River Power Project is a major hydroelectric development in British Columbia, Canada, consisting of dams, reservoirs, and power stations that harness the Bridge River system to generate electricity.
  • E. Shannon hydroelectric scheme
    The Shannon hydroelectric scheme is a major early 20th-century Irish engineering project that harnesses the River Shannon to generate electricity and played a key role in the country’s industrial development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04ddb4c0c81909b3f4c75c91f7f3f completed April 16, 2026, 2:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff456635588190a2473bcff3ae4a53 completed May 9, 2026, 2:32 p.m.
Created at: April 10, 2026, 4:09 a.m.