Triple

T15551944
Position Surface form Disambiguated ID Type / Status
Subject Repulse Dam E370768 entity
Predicate isDownstreamOf P5956 FINISHED
Object Cluny Dam E366926 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cluny Dam | Statement: [Repulse Dam, isDownstreamOf, Cluny Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cluny Dam
Context triple: [Repulse Dam, isDownstreamOf, Cluny Dam]
  • A. Cluny Dam chosen
    Cluny Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s power generation and water management system.
  • B. Saville Dam
    Saville Dam is a large masonry dam in Barkhamsted, Connecticut, that creates the Barkhamsted Reservoir, a major water supply source for the Hartford area.
  • C. Fairbairn Dam
    Fairbairn Dam is a major water storage and irrigation dam in Central Queensland, Australia, primarily serving agricultural and regional water needs near the town of Emerald.
  • D. Clunie Dam
    Clunie Dam is a hydroelectric dam in Perth and Kinross, Scotland, forming part of the Tummel Valley power scheme.
  • E. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04a9551288190a583e8291c35f521 completed April 16, 2026, 2:33 a.m.
NED1 Entity disambiguation (via context triple) batch_6a00dbf2567c81909ab6054ade27afac completed May 10, 2026, 7:26 p.m.
Created at: April 10, 2026, 4:08 a.m.