Triple

T15551923
Position Surface form Disambiguated ID Type / Status
Subject Repulse Dam E370768 entity
Predicate partOf P40 FINISHED
Object Derwent hydropower scheme E351790 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Derwent hydropower scheme | Statement: [Repulse Dam, partOf, Derwent hydropower scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Derwent hydropower scheme
Context triple: [Repulse Dam, partOf, Derwent hydropower scheme]
  • A. Derwent hydropower scheme chosen
    The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
  • B. Tummel hydroelectric scheme
    The Tummel hydroelectric scheme is a major Scottish power project comprising a series of dams, reservoirs, and power stations that harness the waters of the River Tummel and its tributaries to generate electricity.
  • C. Tryweryn reservoir scheme
    The Tryweryn reservoir scheme was a controversial mid-20th-century project by Liverpool Corporation to flood the Welsh village of Capel Celyn to create a water supply reservoir, becoming a lasting symbol of Welsh nationalist grievance.
  • D. Gordon–Pedder hydroelectric scheme
    The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
  • E. Rheidol hydroelectric scheme
    The Rheidol hydroelectric scheme is a major hydroelectric power installation in Ceredigion, Wales, harnessing the River Rheidol to generate renewable electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04a9551288190a583e8291c35f521 completed April 16, 2026, 2:33 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff4c3e67c881909a9fa1e483a364be completed May 9, 2026, 3:01 p.m.
Created at: April 10, 2026, 4:08 a.m.