Triple

T15549268
Position Surface form Disambiguated ID Type / Status
Subject River Dane E370696 entity
Predicate hasTributary P415 FINISHED
Object River Croco E567031 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Croco | Statement: [River Dane, hasTributary, River Croco]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Croco
Context triple: [River Dane, hasTributary, River Croco]
  • A. River Croco chosen
    River Croco is a small river in Cheshire, England, that flows near the town of Middlewich and forms part of the local canal and waterway landscape.
  • B. Crocodile River
    The Crocodile River is a significant river in northeastern South Africa that flows through Gauteng and other provinces, supporting agriculture, ecosystems, and regional water supply.
  • C. River Hipper
    River Hipper is a small river in Derbyshire, England, that flows through the town of Chesterfield before joining the River Rother.
  • D. Noi River
    The Noi River is a significant waterway in central Thailand that branches from and later rejoins the Chao Phraya River, supporting local agriculture and settlements along its course.
  • E. Jordanne River
    The Jordanne River is a watercourse in south-central France that flows through the Cantal region, carving valleys in the Massif Central before joining larger river systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04a93121881909d88ca55a39252ac completed April 16, 2026, 2:33 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff67830b4c8190a8c3f2168d8c2ec7 completed May 9, 2026, 4:57 p.m.
Created at: April 10, 2026, 4:08 a.m.