Triple

T15546341
Position Surface form Disambiguated ID Type / Status
Subject Swisher County E370618 entity
Predicate hasMajorHighway P385 FINISHED
Object U.S. Highway 87 NE NERFINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Highway 87 | Statement: [Swisher County, hasMajorHighway, U.S. Highway 87]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc521a08190921fb50319dddc34 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04a9073948190b6e9cf504aacc7cf completed April 16, 2026, 2:33 a.m.
Created at: April 10, 2026, 4:07 a.m.