Triple

T15539988
Position Surface form Disambiguated ID Type / Status
Subject Nimrod MR2 E370449 entity
Predicate instanceOf P0 FINISHED
Object maritime patrol aircraft variant C35605 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maritime patrol aircraft variant
Context triple: [Nimrod MR2, instanceOf, maritime patrol aircraft variant]
  • A. light attack aircraft variant
    A light attack aircraft variant is a modified version of a basic airframe optimized for low-cost, close air support, counterinsurgency, and limited strike missions with reduced payload and simpler systems compared to dedicated attack aircraft.
  • B. shipboard seaplane
    A shipboard seaplane is an aircraft designed to operate from water and be launched, recovered, and serviced from a ship, typically for reconnaissance, patrol, or liaison duties at sea.
  • C. military trainer aircraft variant
    A military trainer aircraft variant is a modified version of a standard military aircraft specifically adapted with dual controls, simplified systems, or performance changes to safely train pilots and aircrew in operational flying skills.
  • D. bomber aircraft variant
    A bomber aircraft variant is a specific version of a bomber designed or modified to perform particular roles, missions, or operate under distinct performance, payload, or technological configurations.
  • E. naval helicopter
    A naval helicopter is a shipborne rotary-wing aircraft designed and equipped for maritime operations such as anti-submarine warfare, search and rescue, surveillance, and logistics support at sea.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc521a08190921fb50319dddc34 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:07 a.m.