Triple

T15531466
Position Surface form Disambiguated ID Type / Status
Subject Akosombo Dam E370226 entity
Predicate relatedStructure P37 FINISHED
Object Kpong Dam E352672 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kpong Dam | Statement: [Akosombo Dam, relatedStructure, Kpong Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kpong Dam
Context triple: [Akosombo Dam, relatedStructure, Kpong Dam]
  • A. Kpong Dam chosen
    Kpong Dam is a hydroelectric power facility on Ghana’s Volta River that generates electricity and supports irrigation and water supply in the region.
  • B. Thein Dam
    Thein Dam, also known as Ranjit Sagar Dam, is a major multipurpose hydroelectric and irrigation dam located on the Ravi River in northern India.
  • C. Mae Klong Dam
    Mae Klong Dam is a major multi-purpose dam in western Thailand that provides irrigation water, flood control, and hydroelectric power along the Mae Klong River.
  • D. Pak Mun Dam
    Pak Mun Dam is a controversial hydroelectric dam in northeastern Thailand known for its significant social and ecological impacts on communities along the Mun River.
  • E. Pa Sak Jolasid Dam
    Pa Sak Jolasid Dam is a major multi-purpose reservoir and irrigation dam in central Thailand, known for flood control, water supply, and supporting agriculture in the Pa Sak River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc521a08190921fb50319dddc34 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e0414773548190b3311515f9d957dd completed April 16, 2026, 1:54 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff3d5e82a48190bb0a10ebc2412129 completed May 9, 2026, 1:57 p.m.
Created at: April 10, 2026, 4:06 a.m.