Triple
T15531456
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Akosombo Dam |
E370226
|
entity |
| Predicate | projectName |
P16082
|
FINISHED |
| Object |
Volta River Project
The Volta River Project was a major mid-20th-century Ghanaian development initiative centered on harnessing the Volta River for hydroelectric power, industrialization, and regional economic growth.
|
E1162613
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Volta River Project | Statement: [Akosombo Dam, projectName, Volta River Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Volta River Project Context triple: [Akosombo Dam, projectName, Volta River Project]
-
A.
Grand Inga Dam Project
The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
-
B.
Itezhi-Tezhi hydroelectric power project
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
-
C.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
D.
Tuirial Hydroelectric Project
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
-
E.
Uri Hydroelectric Project
The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Volta River Project Triple: [Akosombo Dam, projectName, Volta River Project]
Generated description
The Volta River Project was a major mid-20th-century Ghanaian development initiative centered on harnessing the Volta River for hydroelectric power, industrialization, and regional economic growth.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Volta River Project Target entity description: The Volta River Project was a major mid-20th-century Ghanaian development initiative centered on harnessing the Volta River for hydroelectric power, industrialization, and regional economic growth.
-
A.
Grand Inga Dam Project
The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
-
B.
Itezhi-Tezhi hydroelectric power project
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
-
C.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
D.
Tuirial Hydroelectric Project
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
-
E.
Uri Hydroelectric Project
The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc521a08190921fb50319dddc34 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e0414773548190b3311515f9d957dd |
completed | April 16, 2026, 1:54 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff3d5e82a48190bb0a10ebc2412129 |
completed | May 9, 2026, 1:57 p.m. |
| NEDg | Description generation | batch_69ff3ea7d5ac81908bd1ee64de39dba7 |
completed | May 9, 2026, 2:03 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff413a68488190a6c8907e36a602dc |
completed | May 9, 2026, 2:14 p.m. |
Created at: April 10, 2026, 4:06 a.m.