Triple

T15524701
Position Surface form Disambiguated ID Type / Status
Subject Samurai Japan E369052 entity
Predicate worldBaseballClassicRunnerUp P36586 FINISHED
Object 2023 qualification of USA as finalist (contextual)? LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2023 qualification of USA as finalist (contextual)? | Statement: [Samurai Japan, worldBaseballClassicRunnerUp, 2023 qualification of USA as finalist (contextual)?]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: worldBaseballClassicRunnerUp
Context triple: [Samurai Japan, worldBaseballClassicRunnerUp, 2023 qualification of USA as finalist (contextual)?]
  • A. worldSeriesRunnerUp
    Indicates that one entity finished in second place (was the runner-up) in a specified World Series competition.
  • B. WorldSeriesRunnerUpManager
    Indicates a managerial role held by the person who managed the team that finished as the runner-up in a given World Series.
  • C. WorldCupRunnerUp
    Indicates that an entity finished in second place in a FIFA World Cup tournament, losing in the final match.
  • D. worldCupRunnerUp
    Indicates that an entity finished in second place in a FIFA World Cup tournament.
  • E. reachedWorldBaseballClassicFinal chosen
    Indicates that an entity advanced to and participated in the championship final game or series of the World Baseball Classic tournament.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1794cc8190b0b428716296e63e completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e04143bda08190a2dee44918c1ad1c completed April 16, 2026, 1:54 a.m.
PD Predicate disambiguation batch_69ded28ab0588190a47a9090d1238707 completed April 14, 2026, 11:49 p.m.
Created at: April 10, 2026, 4:05 a.m.