Triple

T15524207
Position Surface form Disambiguated ID Type / Status
Subject Ropsha hills gravity system E369041 entity
Predicate instanceOf P0 FINISHED
Object 18th-century infrastructure C33922 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 18th-century infrastructure
Context triple: [Ropsha hills gravity system, instanceOf, 18th-century infrastructure]
  • A. 19th-century infrastructure
    19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
  • B. 18th-century canal chosen
    An 18th-century canal is a man-made waterway engineered during the 1700s to facilitate transportation, trade, and industrial development by providing a controlled navigable route for boats and barges.
  • C. 18th-century building
    An 18th-century building is a structure constructed between 1701 and 1800 that typically reflects the architectural styles, materials, and construction techniques of that period, such as Georgian, Baroque, or Neoclassical design.
  • D. 18th-century organization
    An 18th-century organization is a formally or informally structured group of individuals operating during the 1700s to pursue political, economic, social, religious, or intellectual objectives within the historical context of early modern society.
  • E. 17th-century town
    A 17th-century town is a small, historically situated settlement characterized by pre-industrial architecture, localized trade and governance, and social life organized around markets, churches, and craft guilds.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1794cc8190b0b428716296e63e completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 4:05 a.m.