Triple

T1551280
Position Surface form Disambiguated ID Type / Status
Subject Central Park Reservoir Running Track E33095 entity
Predicate instanceOf P0 FINISHED
Object pedestrian path C2290 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian path
Context triple: [Central Park Reservoir Running Track, instanceOf, pedestrian path]
  • A. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • B. walking path chosen
    A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
  • C. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • D. parkway
    A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
  • E. long-distance footpath
    A long-distance footpath is an extended, often waymarked walking route designed for multi-day journeys across varied landscapes, typically connecting towns, natural landmarks, or regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ee6db8819099502bc5ce8af881 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:26 p.m.