Triple

T15511412
Position Surface form Disambiguated ID Type / Status
Subject Hedge End E368716 entity
Predicate nearJunctionOf P31669 FINISHED
Object M27 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M27 motorway | Statement: [Hedge End, nearJunctionOf, M27 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M27 motorway
Context triple: [Hedge End, nearJunctionOf, M27 motorway]
  • A. M27 motorway chosen
    The M27 motorway is a major road in southern England that runs east–west along the south coast, linking the New Forest area with Southampton and Portsmouth.
  • B. M271 motorway
    The M271 motorway is a short spur road in Hampshire, England, connecting the M27 to the city of Southampton and its docks.
  • C. M57 motorway
    The M57 motorway is a major orbital route in North West England that serves as a bypass around Liverpool, connecting several key motorways and facilitating regional traffic flow.
  • D. M275 motorway
    The M275 motorway is a short spur road in Hampshire, England, providing the main motorway access from the M27 to the city of Portsmouth and Portsea Island.
  • E. M26 motorway
    The M26 motorway is a short English motorway in Kent that links the M25 and M20, serving as a key connector for traffic between London and the Channel ports.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1794cc8190b0b428716296e63e completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e04030c0208190a1931ea130075603 completed April 16, 2026, 1:49 a.m.
Created at: April 10, 2026, 3:56 a.m.