Triple
T15507138
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Northeast China industrial base |
E379110
|
entity |
| Predicate | historicalPeriodOfRapidDevelopment |
P118915
|
FINISHED |
| Object | First Five-Year Plan of the People’s Republic of China |
E279378
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: First Five-Year Plan of the People’s Republic of China | Statement: [Northeast China industrial base, historicalPeriodOfRapidDevelopment, First Five-Year Plan of the People’s Republic of China]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: First Five-Year Plan of the People’s Republic of China Context triple: [Northeast China industrial base, historicalPeriodOfRapidDevelopment, First Five-Year Plan of the People’s Republic of China]
-
A.
First Five-Year Plan of the People's Republic of China
chosen
The First Five-Year Plan of the People's Republic of China was a centrally planned economic program (1953–1957) focused on rapid industrialization and socialist transformation, heavily influenced by the Soviet model.
-
B.
Second Five-Year Plan of the People's Republic of China
The Second Five-Year Plan of the People's Republic of China was a national economic and social development program (1958–1962) closely associated with the Great Leap Forward, aiming for rapid industrialization and collectivization but resulting in severe economic disruption and famine.
-
C.
Peking Plan
The Peking Plan was a World War II naval operation in which several Polish destroyers, including ORP Grom, were evacuated from the Baltic Sea to British waters just before the German invasion of Poland.
-
D.
Four Modernizations program
The Four Modernizations program was a late-20th-century Chinese reform agenda aimed at rapidly modernizing the country’s agriculture, industry, national defense, and science and technology sectors.
-
E.
First Five-Year Plan of India
The First Five-Year Plan of India was the country’s inaugural national economic program (1951–1956), focused primarily on agricultural development, irrigation, and restoring the economy after independence and Partition.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: historicalPeriodOfRapidDevelopment Context triple: [Northeast China industrial base, historicalPeriodOfRapidDevelopment, First Five-Year Plan of the People’s Republic of China]
-
A.
historicalPeriodOfProsperity
Indicates a time span in which a society, region, or entity experienced notable economic growth, stability, and overall flourishing.
-
B.
historicalPeriodOfExpansion
Indicates a historical period during which the referenced entity underwent significant growth, enlargement, or territorial/organizational expansion.
-
C.
urbanDevelopmentEra
Indicates the historical period or phase during which significant urban development or transformation of a place occurred.
-
D.
timePeriodOfMajorExpansion
Indicates the time span during which the referenced entity underwent its most significant growth or expansion.
-
E.
historicalPeriodOfMajorActivity
Indicates the historical period during which an entity carried out its most significant or influential activities.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd53a7c819080f5b9042c4c199e |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e03fcea8888190a7b69aca360183c3 |
completed | April 16, 2026, 1:47 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff366e472c819093472da2a49593c6 |
completed | May 9, 2026, 1:28 p.m. |
| PD | Predicate disambiguation | batch_69ded2896a9c8190a8b9627deb3c17b4 |
completed | April 14, 2026, 11:49 p.m. |
| PDg | Predicate description generation | batch_69ded57165288190979b7acb71ad5145 |
completed | April 15, 2026, 12:01 a.m. |
Created at: April 10, 2026, 3:55 a.m.