Triple

T15507114
Position Surface form Disambiguated ID Type / Status
Subject Northeast China industrial base E379110 entity
Predicate instanceOf P0 FINISHED
Object heavy industry base C7276 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: heavy industry base
Context triple: [Northeast China industrial base, instanceOf, heavy industry base]
  • A. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • B. industrial town
    An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
  • C. historic industrial structure
    A historic industrial structure is a preserved building or facility originally designed for manufacturing, processing, or other industrial activities, valued today for its architectural, technological, and cultural significance.
  • D. industrial district chosen
    An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
  • E. industrial production system
    An industrial production system is an organized arrangement of people, machines, materials, methods, and information designed to efficiently transform inputs into standardized goods or services at scale.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd53a7c819080f5b9042c4c199e completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 3:55 a.m.