Triple

T15505859
Position Surface form Disambiguated ID Type / Status
Subject Schuylkill Expressway E379079 entity
Predicate abbreviation P43 FINISHED
Object I-76 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-76 | Statement: [Schuylkill Expressway, abbreviation, I-76]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-76
Context triple: [Schuylkill Expressway, abbreviation, I-76]
  • A. Interstate 76 chosen
    Interstate 76 is a major east–west U.S. highway composed of two separate segments in Colorado–Nebraska and Pennsylvania–New Jersey, serving as a key route through the central and northeastern United States.
  • B. Interstate 86
    Interstate 86 is an east–west U.S. Interstate Highway in New York and Pennsylvania that serves as a major corridor through the Southern Tier region.
  • C. Interstate 376
    Interstate 376 is a major highway in western Pennsylvania that connects the Pittsburgh metropolitan area with surrounding regions, including Beaver County and the Pennsylvania Turnpike.
  • D. Interstate 795
    Interstate 795 is a spur route of the Interstate Highway System in Florida that connects local traffic to a primary interstate corridor.
  • E. Interstate 276
    Interstate 276 is a segment of the Pennsylvania Turnpike that serves as a major east–west toll highway in southeastern Pennsylvania, connecting the Harrisburg area toward the New Jersey border near Philadelphia.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd53a7c819080f5b9042c4c199e completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03fcd5d948190b25a67a72ef980e9 completed April 16, 2026, 1:47 a.m.
Created at: April 10, 2026, 3:55 a.m.