Triple

T15489715
Position Surface form Disambiguated ID Type / Status
Subject Guri Dam E377146 entity
Predicate nearbyHydroelectricProjects P15311 FINISHED
Object Macagua Dam E370138 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Macagua Dam | Statement: [Guri Dam, nearbyHydroelectricProjects, Macagua Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Macagua Dam
Context triple: [Guri Dam, nearbyHydroelectricProjects, Macagua Dam]
  • A. Macagua Dam chosen
    Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
  • B. Tavera Dam
    Tavera Dam is a major hydroelectric and water-supply dam in the Dominican Republic, crucial for power generation, irrigation, and flood control in the Yaque del Norte River basin.
  • C. San Vicente Dam
    San Vicente Dam is a major concrete gravity dam in San Diego County, California, that forms San Vicente Reservoir and plays a key role in the region’s water supply and storage.
  • D. Malpaso Dam
    Malpaso Dam is a major hydroelectric dam in Chiapas, Mexico, forming one of the country’s largest reservoirs and playing a key role in national power generation and flood control.
  • E. Bayano Dam
    Bayano Dam is a major hydroelectric dam in Panama that impounds the Bayano River to form Bayano Lake and supply power to the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nearbyHydroelectricProjects
Context triple: [Guri Dam, nearbyHydroelectricProjects, Macagua Dam]
  • A. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • B. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • C. nearbyRiverProject
    Indicates that there is a project located close to or associated with a nearby river.
  • D. nearIrrigationProject
    Indicates that one entity is located close to or in the vicinity of an irrigation project.
  • E. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd21dcc81908646251b1c26ea00 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03faaca588190b0397bc2e27a522a completed April 16, 2026, 1:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff3d4661088190bb53161247effcc4 completed May 9, 2026, 1:57 p.m.
PD Predicate disambiguation batch_69ded2874b788190999158e0f043be21 completed April 14, 2026, 11:49 p.m.
Created at: April 10, 2026, 3:48 a.m.