Triple

T15486701
Position Surface form Disambiguated ID Type / Status
Subject Lower Zab E377065 entity
Predicate hasDam P8736 FINISHED
Object Dukan Dam
Dukan Dam is a major multi-purpose embankment dam in northern Iraq, primarily used for hydroelectric power generation, irrigation, and flood control.
E1159252 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dukan Dam | Statement: [Lower Zab, hasDam, Dukan Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dukan Dam
Context triple: [Lower Zab, hasDam, Dukan Dam]
  • A. Singur Dam
    Singur Dam is a major reservoir and irrigation dam built across the Manjira River in Telangana, India, serving as a key source of drinking water and irrigation for the region.
  • B. Vidraru Dam
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • C. Brilliant Dam
    Brilliant Dam is a hydroelectric dam on the Kootenay River in southeastern British Columbia, Canada, known for generating power for the surrounding region.
  • D. Nihuil Dam
    Nihuil Dam is a hydroelectric dam and popular recreational area located on the Atuel River in Mendoza Province, Argentina.
  • E. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Dukan Dam
Triple: [Lower Zab, hasDam, Dukan Dam]
Generated description
Dukan Dam is a major multi-purpose embankment dam in northern Iraq, primarily used for hydroelectric power generation, irrigation, and flood control.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Dukan Dam
Target entity description: Dukan Dam is a major multi-purpose embankment dam in northern Iraq, primarily used for hydroelectric power generation, irrigation, and flood control.
  • A. Singur Dam
    Singur Dam is a major reservoir and irrigation dam built across the Manjira River in Telangana, India, serving as a key source of drinking water and irrigation for the region.
  • B. Vidraru Dam
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • C. Brilliant Dam
    Brilliant Dam is a hydroelectric dam on the Kootenay River in southeastern British Columbia, Canada, known for generating power for the surrounding region.
  • D. Nihuil Dam
    Nihuil Dam is a hydroelectric dam and popular recreational area located on the Atuel River in Mendoza Province, Argentina.
  • E. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd21dcc81908646251b1c26ea00 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03f8f71a08190a440ff19dcc65312 completed April 16, 2026, 1:46 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff2d1170088190a911f8ea8d2a2066 completed May 9, 2026, 12:48 p.m.
NEDg Description generation batch_69ff2e1fb27c81908de0d755bf30c833 completed May 9, 2026, 12:52 p.m.
NED2 Entity disambiguation (via description) batch_69ff2f3ab6988190b4cefe2f55c4101c completed May 9, 2026, 12:57 p.m.
Created at: April 10, 2026, 3:47 a.m.