Triple
T15485460
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zapolyarnoye gas field |
E377034
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Russia’s unified gas supply system
Russia’s unified gas supply system is the country’s integrated national network of gas fields, pipelines, compressor stations, and storage facilities that transports natural gas from production regions to domestic consumers and export markets.
|
E1159205
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Russia’s unified gas supply system | Statement: [Zapolyarnoye gas field, partOf, Russia’s unified gas supply system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Russia’s unified gas supply system Context triple: [Zapolyarnoye gas field, partOf, Russia’s unified gas supply system]
-
A.
Unified Energy System of Russia
The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
-
B.
Power of Siberia gas pipeline
The Power of Siberia gas pipeline is a major cross-border energy infrastructure project transporting natural gas from Russia to China, symbolizing deepening energy and economic ties between the two countries.
-
C.
Bovanenkovo–Ukhta gas pipeline
The Bovanenkovo–Ukhta gas pipeline is a major Russian natural gas transmission line that transports gas from the Yamal Peninsula’s Bovanenkovo field toward central Russia and European markets.
-
D.
Siberian Unified Power System
The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
-
E.
Transneft pipeline system
The Transneft pipeline system is Russia’s vast state-controlled network of oil pipelines that transports crude from major fields like Vankor to refineries and export terminals.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Russia’s unified gas supply system Triple: [Zapolyarnoye gas field, partOf, Russia’s unified gas supply system]
Generated description
Russia’s unified gas supply system is the country’s integrated national network of gas fields, pipelines, compressor stations, and storage facilities that transports natural gas from production regions to domestic consumers and export markets.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Russia’s unified gas supply system Target entity description: Russia’s unified gas supply system is the country’s integrated national network of gas fields, pipelines, compressor stations, and storage facilities that transports natural gas from production regions to domestic consumers and export markets.
-
A.
Unified Energy System of Russia
The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
-
B.
Power of Siberia gas pipeline
The Power of Siberia gas pipeline is a major cross-border energy infrastructure project transporting natural gas from Russia to China, symbolizing deepening energy and economic ties between the two countries.
-
C.
Bovanenkovo–Ukhta gas pipeline
The Bovanenkovo–Ukhta gas pipeline is a major Russian natural gas transmission line that transports gas from the Yamal Peninsula’s Bovanenkovo field toward central Russia and European markets.
-
D.
Siberian Unified Power System
The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
-
E.
Transneft pipeline system
The Transneft pipeline system is Russia’s vast state-controlled network of oil pipelines that transports crude from major fields like Vankor to refineries and export terminals.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd21dcc81908646251b1c26ea00 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e03f8f71a08190a440ff19dcc65312 |
completed | April 16, 2026, 1:46 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff2d1170088190a911f8ea8d2a2066 |
completed | May 9, 2026, 12:48 p.m. |
| NEDg | Description generation | batch_69ff2e1fb27c81908de0d755bf30c833 |
completed | May 9, 2026, 12:52 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff2f3ab6988190b4cefe2f55c4101c |
completed | May 9, 2026, 12:57 p.m. |
Created at: April 10, 2026, 3:46 a.m.