Triple
T15483012
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Crookwell |
E376968
|
entity |
| Predicate | hasNearbyWindFarm |
P34328
|
FINISHED |
| Object |
Crookwell Wind Farm
Crookwell Wind Farm is one of Australia’s early commercial wind power projects, located near Crookwell in New South Wales and contributing renewable electricity to the grid.
|
E1158525
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Crookwell Wind Farm | Statement: [Crookwell, hasNearbyWindFarm, Crookwell Wind Farm]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Crookwell Wind Farm Context triple: [Crookwell, hasNearbyWindFarm, Crookwell Wind Farm]
-
A.
Roan wind farm
Roan wind farm is a large onshore wind power facility in the Fosen region of Norway, contributing significantly to the country’s renewable energy production.
-
B.
Woodlawn wind farm
Woodlawn wind farm is a renewable energy facility in New South Wales, Australia, consisting of multiple wind turbines that generate electricity for the regional power grid.
-
C.
Mars Hill Mountain wind farm
Mars Hill Mountain wind farm is a commercial wind energy facility in northern Maine that generates electricity using turbines installed along Mars Hill Mountain’s ridgeline.
-
D.
Burrinjuck Power Station
Burrinjuck Power Station is a hydroelectric power facility in New South Wales, Australia, that generates electricity using water from Burrinjuck Dam on the Murrumbidgee River.
-
E.
Cowley Ridge Wind Farm
Cowley Ridge Wind Farm was one of Canada’s first commercial wind power projects, located near Pincher Creek in southern Alberta and known for pioneering large-scale wind energy development in the country.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Crookwell Wind Farm Triple: [Crookwell, hasNearbyWindFarm, Crookwell Wind Farm]
Generated description
Crookwell Wind Farm is one of Australia’s early commercial wind power projects, located near Crookwell in New South Wales and contributing renewable electricity to the grid.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Crookwell Wind Farm Target entity description: Crookwell Wind Farm is one of Australia’s early commercial wind power projects, located near Crookwell in New South Wales and contributing renewable electricity to the grid.
-
A.
Roan wind farm
Roan wind farm is a large onshore wind power facility in the Fosen region of Norway, contributing significantly to the country’s renewable energy production.
-
B.
Woodlawn wind farm
Woodlawn wind farm is a renewable energy facility in New South Wales, Australia, consisting of multiple wind turbines that generate electricity for the regional power grid.
-
C.
Mars Hill Mountain wind farm
Mars Hill Mountain wind farm is a commercial wind energy facility in northern Maine that generates electricity using turbines installed along Mars Hill Mountain’s ridgeline.
-
D.
Burrinjuck Power Station
Burrinjuck Power Station is a hydroelectric power facility in New South Wales, Australia, that generates electricity using water from Burrinjuck Dam on the Murrumbidgee River.
-
E.
Cowley Ridge Wind Farm
Cowley Ridge Wind Farm was one of Canada’s first commercial wind power projects, located near Pincher Creek in southern Alberta and known for pioneering large-scale wind energy development in the country.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasNearbyWindFarm Context triple: [Crookwell, hasNearbyWindFarm, Crookwell Wind Farm]
-
A.
hasWindFarm
chosen
Indicates that one entity possesses, hosts, or contains a wind farm as part of its assets, infrastructure, or territory.
-
B.
hasNearbyOilAndGasFields
Indicates that an entity is located close to one or more oil and gas extraction fields.
-
C.
hasNearbyOilField
Indicates that an entity is located close to or in the vicinity of an oil field.
-
D.
hasTurbines
Indicates that one entity is equipped with, contains, or includes one or more turbines in relation to another entity.
-
E.
hasOffshoreWindFarm
Indicates that an entity owns, operates, or is otherwise associated with a wind farm located in offshore (marine) areas.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd21dcc81908646251b1c26ea00 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e03f8e6ff08190b130b3a38f4190e7 |
completed | April 16, 2026, 1:46 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff2d0f4e648190b9cd9b1464209224 |
completed | May 9, 2026, 12:48 p.m. |
| NEDg | Description generation | batch_69ff2de2d82c819085d903a538313e70 |
completed | May 9, 2026, 12:51 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff2ea08ad08190b3ecf29bfe7a809a |
completed | May 9, 2026, 12:54 p.m. |
| PD | Predicate disambiguation | batch_69ded2874b788190999158e0f043be21 |
completed | April 14, 2026, 11:49 p.m. |
Created at: April 10, 2026, 3:40 a.m.