Triple
T15475942
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Safety Harbor site |
E376780
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | temple mound complex |
C35508
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: temple mound complex Context triple: [Safety Harbor site, instanceOf, temple mound complex]
-
A.
New Kingdom burial complex
A New Kingdom burial complex is an architecturally elaborate mortuary installation—often including tombs, chapels, shafts, and associated cult spaces—designed to house and ritually sustain the dead within the religious and political landscape of New Kingdom Egypt.
-
B.
Maya ceremonial platform
A Maya ceremonial platform is an elevated, often rectangular structure used as a sacred stage for rituals, offerings, and public religious performances within Maya civic-ceremonial centers.
-
C.
Maya monument
A Maya monument is a large, often intricately carved architectural or sculptural structure created by the ancient Maya civilization to commemorate rulers, deities, historical events, or cosmological beliefs.
-
D.
Maya city
A Maya city is a pre-Columbian urban center of the Maya civilization characterized by monumental architecture, complex social and political organization, and integration with surrounding agricultural and ritual landscapes.
-
E.
Moche pyramid
A Moche pyramid is a monumental, terraced adobe structure built by the Moche civilization of ancient Peru, serving as a ceremonial, administrative, and sometimes funerary center.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd21dcc81908646251b1c26ea00 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 3:34 a.m.