Triple
T15474779
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Global Centroid Moment Tensor Project |
E376755
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | earthquake catalog |
C35505
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: earthquake catalog Context triple: [Global Centroid Moment Tensor Project, instanceOf, earthquake catalog]
-
A.
earthquake sequence
An earthquake sequence is a series of temporally and spatially related earthquakes, including mainshocks, foreshocks, and aftershocks, that occur as a fault system adjusts to stress changes in the Earth's crust.
-
B.
earthquake monitoring center
An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
-
C.
interplate earthquake
An interplate earthquake is a seismic event that occurs along the boundary between two tectonic plates as they grind, collide, or slide past one another.
-
D.
seismicity pattern
A seismicity pattern is the spatial and temporal distribution of earthquakes and related seismic events that reveals underlying tectonic processes and potential precursory signals.
-
E.
earthquake intensity scale
An earthquake intensity scale is a system that categorizes and describes the observed effects and damage of an earthquake at specific locations on the Earth's surface.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd21dcc81908646251b1c26ea00 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 3:34 a.m.