Triple

T15474400
Position Surface form Disambiguated ID Type / Status
Subject Main Injector at Fermilab E376746 entity
Predicate hasUpgrade P5357 FINISHED
Object Proton Improvement Plan (PIP) E1132324 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Proton Improvement Plan (PIP)
Context triple: [Main Injector at Fermilab, hasUpgrade, Proton Improvement Plan (PIP)]
  • A. Proton Improvement Plan chosen
    The Proton Improvement Plan is a Fermilab accelerator upgrade initiative designed to significantly increase the intensity and reliability of the laboratory’s proton beam for high-energy physics experiments.
  • B. LHC Injectors Upgrade (LIU)
    The LHC Injectors Upgrade (LIU) is a major CERN project to modernize and enhance the performance of the accelerator chain feeding the Large Hadron Collider, enabling higher beam intensities and luminosities for future physics runs.
  • C. Jefferson Lab 12 GeV Upgrade program
    The Jefferson Lab 12 GeV Upgrade program is a major enhancement of the Continuous Electron Beam Accelerator Facility designed to enable next-generation nuclear and particle physics experiments, including detailed studies of hadron structure and the strong force.
  • D. Plasma Diagnostics Package (PDP)
    The Plasma Diagnostics Package (PDP) was a scientific instrument suite flown on NASA’s Spacelab 2 mission to study the properties and behavior of space plasmas in Earth orbit.
  • E. Common Muon and Proton Apparatus for Structure and Spectroscopy
    The Common Muon and Proton Apparatus for Structure and Spectroscopy (COMPASS) is a fixed-target experiment at CERN designed to investigate the internal structure and dynamics of hadrons using high-intensity muon and hadron beams.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69d85cd21dcc81908646251b1c26ea00 elicitation completed
NER batch_69e03f6e859481909c3d08343b7ad27c ner completed
NED1 batch_69ff2d075e64819097061ef4c205577e ned_source_triple completed
Created at: April 10, 2026, 3:34 a.m.