Triple
T15469371
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Inner Loop |
E372116
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevated railway loop |
C539
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevated railway loop Context triple: [Inner Loop, instanceOf, elevated railway loop]
-
A.
elevated railway
chosen
An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
-
B.
trolley turning loop
A trolley turning loop is a track configuration that allows a trolley or tram to reverse direction by following a continuous curved path without needing to be turned around manually.
-
C.
urban rail loop line
An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
-
D.
cogwheel railway
A cogwheel railway is a type of railway that uses a toothed rack rail engaged by a cogwheel on the train to enable safe operation on steep gradients.
-
E.
straddle-beam monorail
A straddle-beam monorail is a transit system in which rubber-tired vehicles ride astride a single elevated concrete or steel beam, using it for both support and guidance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc8bd308190886949510b42e764 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 3:33 a.m.