Triple

T15467782
Position Surface form Disambiguated ID Type / Status
Subject Volkhov Hydroelectric Station E372073 entity
Predicate gridConnection P845 FINISHED
Object Northwest power system of Russia
The Northwest power system of Russia is a regional electric power grid that integrates generation facilities like the Volkhov Hydroelectric Station to supply electricity across the northwestern part of the country.
E1158648 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Northwest power system of Russia | Statement: [Volkhov Hydroelectric Station, gridConnection, Northwest power system of Russia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Northwest power system of Russia
Context triple: [Volkhov Hydroelectric Station, gridConnection, Northwest power system of Russia]
  • A. Siberian Unified Power System
    The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
  • B. Kamchatka power grid
    The Kamchatka power grid is the regional electrical network in Russia’s Kamchatka Peninsula that distributes electricity from local generation sources, including geothermal plants, to consumers across the area.
  • C. Unified Energy System of Russia
    The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
  • D. Baltic power grid
    The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
  • E. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Northwest power system of Russia
Triple: [Volkhov Hydroelectric Station, gridConnection, Northwest power system of Russia]
Generated description
The Northwest power system of Russia is a regional electric power grid that integrates generation facilities like the Volkhov Hydroelectric Station to supply electricity across the northwestern part of the country.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Northwest power system of Russia
Target entity description: The Northwest power system of Russia is a regional electric power grid that integrates generation facilities like the Volkhov Hydroelectric Station to supply electricity across the northwestern part of the country.
  • A. Siberian Unified Power System
    The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
  • B. Kamchatka power grid
    The Kamchatka power grid is the regional electrical network in Russia’s Kamchatka Peninsula that distributes electricity from local generation sources, including geothermal plants, to consumers across the area.
  • C. Unified Energy System of Russia
    The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
  • D. Baltic power grid
    The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
  • E. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc8bd308190886949510b42e764 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03f69a31c81909a749247b6615d91 completed April 16, 2026, 1:46 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff2d03845c8190bc8cb96827a5da39 completed May 9, 2026, 12:48 p.m.
NEDg Description generation batch_69ff2e2fb3e48190b2274d54586b1f00 completed May 9, 2026, 12:53 p.m.
NED2 Entity disambiguation (via description) batch_69ff2ec231dc8190b82333e3e54ced20 completed May 9, 2026, 12:55 p.m.
Created at: April 10, 2026, 3:33 a.m.