Triple

T15463876
Position Surface form Disambiguated ID Type / Status
Subject Husband Hill E371973 entity
Predicate hasEponymMission P84481 FINISHED
Object STS-107 E35817 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-107 | Statement: [Husband Hill, hasEponymMission, STS-107]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-107
Context triple: [Husband Hill, hasEponymMission, STS-107]
  • A. STS-107 chosen
    STS-107 was the final mission of Space Shuttle Columbia, tragically ending in 2003 when the orbiter disintegrated during reentry, killing all seven astronauts aboard.
  • B. STS-51L
    STS-51L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, leading to the deaths of its seven crew members and major reforms in NASA’s spaceflight program.
  • C. STS-51-L
    STS-51-L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, resulting in the loss of all seven crew members.
  • D. STS-77
    STS-77 was a 1996 NASA Space Shuttle Endeavour mission focused on microgravity research and technology demonstrations in low Earth orbit.
  • E. STS-97
    STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasEponymMission
Context triple: [Husband Hill, hasEponymMission, STS-107]
  • A. hasNamesakeMission chosen
    Indicates that one entity has a mission named after it or sharing its name.
  • B. hasNotableMission
    Indicates that an entity is associated with a mission or undertaking that is considered significant or noteworthy.
  • C. missionName
    Indicates the designated title or label assigned to a specific mission or operation.
  • D. isTargetOfMission
    Indicates that an entity is the intended objective or focus of a particular mission or operation.
  • E. missionTypeOnMaidenVoyage
    Indicates the type or nature of the mission specifically during an entity’s maiden (first) voyage.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc8bd308190886949510b42e764 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03f1927708190a0d2b63e75469a0e completed April 16, 2026, 1:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff365504488190a6f43d82d008c855 completed May 9, 2026, 1:27 p.m.
PD Predicate disambiguation batch_69ded284bd008190b31c53b4f1cebadd completed April 14, 2026, 11:49 p.m.
Created at: April 10, 2026, 3:33 a.m.