Triple

T15454616
Position Surface form Disambiguated ID Type / Status
Subject Sansculottides E371737 entity
Predicate instanceOf P0 FINISHED
Object festival days C36177 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: festival days
Context triple: [Sansculottides, instanceOf, festival days]
  • A. intermediate days of a festival
    The intermediate days of a festival are the non-opening, non-closing days within a festival’s overall duration, typically marked by ongoing celebrations, rituals, or activities that sustain the event’s spirit between its major ceremonial endpoints.
  • B. festival
    A festival is a planned, often recurring event where a community gathers to celebrate cultural, religious, seasonal, or thematic traditions through shared activities, performances, and rituals.
  • C. art festival
    An art festival is a public event that showcases diverse forms of visual, performing, and interactive art through exhibitions, performances, and activities, often celebrating creativity within a specific community or theme.
  • D. folk festival
    A folk festival is a community-centered event that celebrates traditional culture through music, dance, crafts, food, and rituals rooted in local or regional heritage.
  • E. street festival
    A street festival is a public outdoor event where roads are closed to traffic and filled with temporary attractions such as food stalls, live performances, games, and cultural activities for community celebration.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc8bd308190886949510b42e764 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 3:31 a.m.