Triple
T15454615
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sansculottides |
E371737
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | set of complementary days |
C36176
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: set of complementary days Context triple: [Sansculottides, instanceOf, set of complementary days]
-
A.
day of rest
A day of rest is a designated period, typically recurring weekly, during which normal work and obligations are minimized or suspended to allow for physical, mental, and spiritual rejuvenation.
-
B.
day of the week
A day of the week is one of the seven recurring, named 24-hour periods that together structure the weekly cycle of time.
-
C.
calendar algorithm
A calendar algorithm is a computational method or set of rules used to calculate and manage dates, recurring events, and time-based patterns within a calendar system.
-
D.
part of day
A part of day is a temporal segment of a 24-hour period characterized by distinct patterns of light, activity, and social or natural routines (e.g., morning, afternoon, evening, night).
-
E.
intermediate days of a festival
The intermediate days of a festival are the non-opening, non-closing days within a festival’s overall duration, typically marked by ongoing celebrations, rituals, or activities that sustain the event’s spirit between its major ceremonial endpoints.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc8bd308190886949510b42e764 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 3:31 a.m.