Triple

T15454499
Position Surface form Disambiguated ID Type / Status
Subject Ventôse E371733 entity
Predicate startDateRule P118862 FINISHED
Object begins around 19 or 20 February LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: begins around 19 or 20 February | Statement: [Ventôse, startDateRule, begins around 19 or 20 February]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: startDateRule
Context triple: [Ventôse, startDateRule, begins around 19 or 20 February]
  • A. startDateConstraint
    Indicates a restriction or condition placed on when something is allowed to start, typically specifying valid or required start dates.
  • B. startDate
    Indicates the point in time when an event, state, or relationship begins.
  • C. startDateNewStyle
    Indicates the date on which something begins, expressed according to the New Style (Gregorian) calendar rather than the Old Style (Julian) calendar.
  • D. startsAt
    Indicates that an event, process, or state begins at a specific time, location, or point in a sequence.
  • E. startsOnDay
    Indicates that an event or process begins on a specified calendar day.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc8bd308190886949510b42e764 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03f131b1481909ff099c3b844ee07 completed April 16, 2026, 1:44 a.m.
PD Predicate disambiguation batch_69ded28276f481908c2038bb301e57cf completed April 14, 2026, 11:49 p.m.
PDg Predicate description generation batch_69ded57005608190886cd01f640dfedb completed April 15, 2026, 12:01 a.m.
Created at: April 10, 2026, 3:31 a.m.