Triple

T15450584
Position Surface form Disambiguated ID Type / Status
Subject Macagua Dam E370138 entity
Predicate connectedTo P37 FINISHED
Object Guri Dam E377146 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Guri Dam | Statement: [Macagua Dam, connectedTo, Guri Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Guri Dam
Context triple: [Macagua Dam, connectedTo, Guri Dam]
  • A. Guri Dam chosen
    Guri Dam is one of the world’s largest hydroelectric dams, located on the Caroní River in Venezuela and a major source of the country’s electricity.
  • B. Kurobe Dam
    Kurobe Dam is a major hydroelectric dam in Japan’s Northern Alps, renowned for its impressive scale, scenic mountain setting, and status as a key sightseeing highlight along the Tateyama Kurobe Alpine Route.
  • C. Oahe Dam
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • D. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • E. Kajaki Dam
    Kajaki Dam is a major hydroelectric and irrigation dam on the Helmand River in southern Afghanistan, known both for its strategic importance and as the site of significant military activity during the Afghan conflict.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a19180081909925012fbf4e62a3 completed April 10, 2026, 2:02 a.m.
NER Named-entity recognition batch_69e03efaf82c81908b464e37ce9c159a completed April 16, 2026, 1:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff21b1e9688190a283dbc552072ce0 completed May 9, 2026, 11:59 a.m.
Created at: April 10, 2026, 3:21 a.m.