Triple
T15431952
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sixth Street Viaduct |
E369661
|
entity |
| Predicate | structuralEngineer |
P616
|
FINISHED |
| Object | HNTB |
E287125
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: HNTB | Statement: [Sixth Street Viaduct, structuralEngineer, HNTB]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: HNTB Context triple: [Sixth Street Viaduct, structuralEngineer, HNTB]
-
A.
HNTB
chosen
HNTB is a prominent American architecture, engineering, and planning firm known for designing major sports venues and transportation infrastructure projects.
-
B.
CH2M Hill
CH2M Hill was a global engineering and construction firm known for its large-scale infrastructure, environmental, and transportation projects.
-
C.
Parsons Brinckerhoff
Parsons Brinckerhoff is a global engineering and professional services firm known for its major infrastructure and transportation projects.
-
D.
AECOM
AECOM is a global infrastructure consulting firm that provides architecture, engineering, construction management, and related professional services for large-scale public and private projects.
-
E.
Michael Baker Jr., Inc.
Michael Baker Jr., Inc. is an American engineering and consulting firm renowned for its major infrastructure projects, including iconic bridges and transportation systems.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a19180081909925012fbf4e62a3 |
completed | April 10, 2026, 2:02 a.m. |
| NER | Named-entity recognition | batch_69e03eda01cc8190843e23b260b8503c |
completed | April 16, 2026, 1:43 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff1a8546948190a69ae1306bc19c64 |
completed | May 9, 2026, 11:29 a.m. |
Created at: April 10, 2026, 3:21 a.m.