Triple

T15421348
Position Surface form Disambiguated ID Type / Status
Subject Companhia Real dos Caminhos de Ferro Portugueses E369386 entity
Predicate operatedRailway P81222 FINISHED
Object Linha do Sul E62905 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Linha do Sul | Statement: [Companhia Real dos Caminhos de Ferro Portugueses, operatedRailway, Linha do Sul]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Linha do Sul
Context triple: [Companhia Real dos Caminhos de Ferro Portugueses, operatedRailway, Linha do Sul]
  • A. Linha do Sul chosen
    Linha do Sul is a major Portuguese railway line that connects Lisbon to the southern Algarve region, serving as a key route for both passenger and freight transport.
  • B. Linha do Tiro
    Linha do Tiro is a neighborhood located in the city of Recife, in Brazil’s northeastern state of Pernambuco.
  • C. A Serrana
    A Serrana is a Portuguese opera composed by Alfredo Keil, recognized as one of the significant works in 19th-century Portuguese musical theater.
  • D. Encruzilhada
    Encruzilhada is a neighborhood in the city of Recife, Brazil, known for its busy commercial areas and urban residential character.
  • E. Linha do Norte
    Linha do Norte is Portugal’s principal mainline railway corridor, linking Lisbon and Porto and serving as the country’s busiest and most important rail route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1849f48190bf898068b2806fae completed April 10, 2026, 2:02 a.m.
NER Named-entity recognition batch_69e03ebe7b1081908e6b9e6e128a8d5d completed April 16, 2026, 1:43 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1a7d02a08190a1e34e3a014acea9 completed May 9, 2026, 11:29 a.m.
Created at: April 10, 2026, 3:20 a.m.