Triple

T15413577
Position Surface form Disambiguated ID Type / Status
Subject Silkk the Shocker E369152 entity
Predicate album P1995 FINISHED
Object All I Do Is Win E716275 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: All I Do Is Win | Statement: [Silkk the Shocker, album, All I Do Is Win]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: All I Do Is Win
Context triple: [Silkk the Shocker, album, All I Do Is Win]
  • A. All I Do Is Win chosen
    "All I Do Is Win" is a popular hip hop anthem by DJ Khaled featuring several prominent rappers, widely known for its triumphant chorus and frequent use at sporting events.
  • B. We Gonna Win
    "We Gonna Win" is a hip-hop influenced violin track by The Hip-Hop Violinist that blends classical string performance with contemporary urban beats.
  • C. I Can’t Win
    "I Can’t Win" is a song featured on the rock and roll album "Bop Till You Drop" by Ry Cooder.
  • D. All I Do
    "All I Do" is a song featured on the country music album "Blue Collar."
  • E. All I Do
    "All I Do" is a soulful R&B song by Stevie Wonder from his 1980 album "Hotter than July," known for its smooth groove and romantic lyrics.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1849f48190bf898068b2806fae completed April 10, 2026, 2:02 a.m.
NER Named-entity recognition batch_69e03ea7561481909b04e613e2352f82 completed April 16, 2026, 1:43 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1a7722a08190af230ecafda30b18 completed May 9, 2026, 11:28 a.m.
Created at: April 10, 2026, 3:20 a.m.