Triple

T15411861
Position Surface form Disambiguated ID Type / Status
Subject PETRONAS E368612 entity
Predicate subsidiary P258 FINISHED
Object MISC Berhad E364186 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MISC Berhad | Statement: [PETRONAS, subsidiary, MISC Berhad]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MISC Berhad
Context triple: [PETRONAS, subsidiary, MISC Berhad]
  • A. MISC Berhad chosen
    MISC Berhad is a leading Malaysian international shipping and maritime logistics company, particularly known for its energy-related shipping services.
  • B. MMC Corporation Berhad
    MMC Corporation Berhad is a leading Malaysian utilities and infrastructure conglomerate with major interests in ports, logistics, engineering, and energy.
  • C. PLUS Malaysia Berhad
    PLUS Malaysia Berhad is Malaysia’s largest highway concessionaire company, responsible for operating and maintaining major expressways and key infrastructure across the country.
  • D. Sunway Group
    Sunway Group is a Malaysian conglomerate with diversified interests in property development, construction, education, healthcare, and hospitality.
  • E. Sendirian Berhad
    Sendirian Berhad is a private limited company structure in Malaysia that restricts share transfers and limits shareholders’ liability.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a16c68c819099c1b547fbc87b32 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03ea600b48190a3dbca1a68a2a1cd completed April 16, 2026, 1:43 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1a754d1881909ed322479bab460d completed May 9, 2026, 11:28 a.m.
Created at: April 10, 2026, 3:20 a.m.