Triple

T15411712
Position Surface form Disambiguated ID Type / Status
Subject Marseilles Lock and Dam E368609 entity
Predicate instanceOf P0 FINISHED
Object infrastructure on the Illinois River C16044 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure on the Illinois River
Context triple: [Marseilles Lock and Dam, instanceOf, infrastructure on the Illinois River]
  • A. canal infrastructure chosen
    Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
  • B. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • C. island in the Rhine
    An island in the Rhine is a naturally or artificially formed landmass surrounded by the river’s flowing waters, influencing local ecology, navigation, and human use along its course.
  • D. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • E. lakeside infrastructure
    Lakeside infrastructure encompasses the built facilities and systems—such as docks, marinas, retaining walls, pathways, utilities, and shoreline protections—designed to support human use, access, and environmental management along lake shores.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a16c68c819099c1b547fbc87b32 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:20 a.m.