Triple
T15411712
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Marseilles Lock and Dam |
E368609
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure on the Illinois River |
C16044
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure on the Illinois River Context triple: [Marseilles Lock and Dam, instanceOf, infrastructure on the Illinois River]
-
A.
canal infrastructure
chosen
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
-
B.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
C.
island in the Rhine
An island in the Rhine is a naturally or artificially formed landmass surrounded by the river’s flowing waters, influencing local ecology, navigation, and human use along its course.
-
D.
Panama Canal infrastructure
Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
-
E.
lakeside infrastructure
Lakeside infrastructure encompasses the built facilities and systems—such as docks, marinas, retaining walls, pathways, utilities, and shoreline protections—designed to support human use, access, and environmental management along lake shores.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a16c68c819099c1b547fbc87b32 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:20 a.m.