Triple
T15403636
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wardha River |
E368389
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Bembla Dam
Bembla Dam is a major irrigation and water management structure built on the Wardha River in Maharashtra, India.
|
E1174680
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bembla Dam | Statement: [Wardha River, hasDam, Bembla Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bembla Dam Context triple: [Wardha River, hasDam, Bembla Dam]
-
A.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
B.
Walayar Dam
Walayar Dam is a reservoir and irrigation dam located near the Kerala–Tamil Nadu border in India, serving as a key water source and scenic spot in the Palakkad region.
-
C.
Mula Dam
Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
-
D.
Irganai Dam
Irganai Dam is a major hydroelectric dam in Russia’s Dagestan region, known for its large installed capacity and role in supplying power to the North Caucasus.
-
E.
Hidkal Dam
Hidkal Dam is a major irrigation and hydroelectric dam built across the Ghataprabha River in Karnataka, India.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Bembla Dam Triple: [Wardha River, hasDam, Bembla Dam]
Generated description
Bembla Dam is a major irrigation and water management structure built on the Wardha River in Maharashtra, India.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Bembla Dam Target entity description: Bembla Dam is a major irrigation and water management structure built on the Wardha River in Maharashtra, India.
-
A.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
B.
Walayar Dam
Walayar Dam is a reservoir and irrigation dam located near the Kerala–Tamil Nadu border in India, serving as a key water source and scenic spot in the Palakkad region.
-
C.
Mula Dam
Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
-
D.
Irganai Dam
Irganai Dam is a major hydroelectric dam in Russia’s Dagestan region, known for its large installed capacity and role in supplying power to the North Caucasus.
-
E.
Hidkal Dam
Hidkal Dam is a major irrigation and hydroelectric dam built across the Ghataprabha River in Karnataka, India.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a16c68c819099c1b547fbc87b32 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e03e8fde64819082ec0c68df305561 |
completed | April 16, 2026, 1:42 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff8759922c8190ae5a5700e3ecc87c |
completed | May 9, 2026, 7:13 p.m. |
| NEDg | Description generation | batch_69ff87f0eed08190a0eaffb4a32f1eae |
completed | May 9, 2026, 7:16 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff88ba20788190aeadd14e56c510db |
completed | May 9, 2026, 7:19 p.m. |
Created at: April 10, 2026, 3:19 a.m.