Triple

T15400196
Position Surface form Disambiguated ID Type / Status
Subject Nalla Thangal Odai E368293 entity
Predicate instanceOf P0 FINISHED
Object feeder waterway C22910 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: feeder waterway
Context triple: [Nalla Thangal Odai, instanceOf, feeder waterway]
  • A. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • B. waterway network
    A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
  • C. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • D. river distributary chosen
    A river distributary is a branch of a river that diverges from the main channel and flows away from it, typically found in delta regions where sediment deposition causes the river to split into multiple smaller channels.
  • E. river
    A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a16c68c819099c1b547fbc87b32 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:19 a.m.