Triple

T15380760
Position Surface form Disambiguated ID Type / Status
Subject Morinomiya Depot E367791 entity
Predicate instanceOf P0 FINISHED
Object Osaka Metro facility C35988 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Osaka Metro facility
Context triple: [Morinomiya Depot, instanceOf, Osaka Metro facility]
  • A. Tokyo subway station
    A Tokyo subway station is an underground or partially above-ground transit facility in Tokyo that serves as a node for multiple subway lines, providing passenger access, ticketing, and platform areas within a dense urban rail network.
  • B. Tobu Railway station
    A Tobu Railway station is a passenger rail facility operated by the private Japanese company Tobu Railway, serving as a stop for its regional and commuter train services.
  • C. BTS Skytrain facility
    A BTS Skytrain facility is an infrastructure element that supports the operation, maintenance, and management of Bangkok’s elevated rapid transit system, including stations, depots, control centers, and related service areas.
  • D. special ward of Osaka City
    A special ward of Osaka City is a proposed administrative subdivision that would function with a high degree of local autonomy under Osaka’s metropolitan-style governance, similar to Tokyo’s special wards.
  • E. 大阪市内の駅
    大阪市内の駅は、大阪市の行政区域内に位置し、鉄道各社が運行する路線の乗降や乗り換えの拠点となる鉄道駅の総称である。
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1551a08190ba2caea7cd51c639 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:19 a.m.