Triple

T15357496
Position Surface form Disambiguated ID Type / Status
Subject Kragle E367199 entity
Predicate opposedBy P437 FINISHED
Object the Master Builders E367181 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: the Master Builders | Statement: [Kragle, opposedBy, the Master Builders]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: the Master Builders
Context triple: [Kragle, opposedBy, the Master Builders]
  • A. Master Builders chosen
    Master Builders are a group of highly skilled and imaginative LEGO characters capable of constructing complex creations without instructions in The LEGO Movie universe.
  • B. The Builders
    The Builders is a modernist painting by French artist Fernand Léger that depicts construction workers amid geometric forms, celebrating industrialization and urban life.
  • C. The Builders
    "The Builders" is a classic episode of the British sitcom Fawlty Towers in which a disastrously cheap construction job wreaks havoc on Basil Fawlty's hotel.
  • D. Upbuilders
    Upbuilders is a collection of muckraking essays by American journalist Lincoln Steffens that examines political and social reform in early 20th-century America.
  • E. Master of the Works
    Master of the Works was a senior British royal architectural and construction office responsible for overseeing the design, maintenance, and building of royal properties and public works.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1483788190ad93c2748e8af34b completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03e2d4934819097fc63603964217c completed April 16, 2026, 1:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1343862481908962dfe0ab946b97 completed May 9, 2026, 10:58 a.m.
Created at: April 10, 2026, 3:18 a.m.