Triple

T15357147
Position Surface form Disambiguated ID Type / Status
Subject Batcomputer E367191 entity
Predicate firstAppearanceWork P3278 FINISHED
Object Batman comics E543851 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Batman comics | Statement: [Batcomputer, firstAppearanceWork, Batman comics]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Batman comics
Context triple: [Batcomputer, firstAppearanceWork, Batman comics]
  • A. Batman comics chosen
    Batman comics are a long-running series of DC Comics publications that chronicle the adventures of the superhero Batman, his allies, and his rogues’ gallery in Gotham City.
  • B. Batman
    Batman is a popular DC Comics superhero and cultural icon known for fighting crime in Gotham City using his intellect, detective skills, and advanced technology instead of superhuman powers.
  • C. Batman #307
    Batman #307 is a 1979 DC Comics issue notable for introducing Lucius Fox, a key executive ally of Bruce Wayne and the Batman mythos.
  • D. Batman #1
    Batman #1 is a 1940 comic book published by DC Comics that launched Batman’s self-titled series and introduced key characters including the Joker and Catwoman.
  • E. Batman Dam
    Batman Dam is a major rock-fill embankment dam in southeastern Turkey, built primarily for hydroelectric power generation and irrigation on the Batman River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1483788190ad93c2748e8af34b completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03e2d4934819097fc63603964217c completed April 16, 2026, 1:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff219635b08190a19dcaeb72240379 completed May 9, 2026, 11:59 a.m.
Created at: April 10, 2026, 3:18 a.m.