Triple

T15352440
Position Surface form Disambiguated ID Type / Status
Subject Los Angeles River Ecosystem Restoration project E367086 entity
Predicate instanceOf P0 FINISHED
Object river revitalization project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river revitalization project
Context triple: [Los Angeles River Ecosystem Restoration project, instanceOf, river revitalization project]
  • A. river conservancy
    River conservancy is the management and protection of river ecosystems through planning, regulation, restoration, and sustainable use to maintain their ecological health and benefits to society.
  • B. waterfront revitalization plan
    A waterfront revitalization plan is a comprehensive strategy to transform underused or deteriorated shoreline areas into vibrant, accessible, and sustainable public and economic spaces.
  • C. restored waterway
    A restored waterway is a previously degraded or altered river, stream, or canal that has been rehabilitated to improve its ecological function, water quality, and surrounding habitat while often enhancing recreational and aesthetic values.
  • D. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • E. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1355608190a6673ddb67231d54 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:17 a.m.