Triple
T15352300
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Los Angeles County Flood Control District |
E367083
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood control district |
C12171
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood control district Context triple: [Los Angeles County Flood Control District, instanceOf, flood control district]
-
A.
flood control agency
chosen
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
B.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
C.
watershed district
A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
-
D.
U.S. Army Corps of Engineers district
A U.S. Army Corps of Engineers district is a regional organizational unit responsible for planning, designing, constructing, and managing civil works and military projects within a defined geographic area.
-
E.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a1355608190a6673ddb67231d54 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:17 a.m.