Triple

T15352222
Position Surface form Disambiguated ID Type / Status
Subject Verdugo Wash E367081 entity
Predicate instanceOf P0 FINISHED
Object concrete-lined flood control channel C6500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete-lined flood control channel
Context triple: [Verdugo Wash, instanceOf, concrete-lined flood control channel]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. drainage channel chosen
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • C. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • D. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • E. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1355608190a6673ddb67231d54 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:17 a.m.