Triple

T15347322
Position Surface form Disambiguated ID Type / Status
Subject Lake Pedder E366956 entity
Predicate operator P179 FINISHED
Object Hydro-Electric Commission of Tasmania E1085265 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hydro-Electric Commission of Tasmania | Statement: [Lake Pedder, operator, Hydro-Electric Commission of Tasmania]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hydro-Electric Commission of Tasmania
Context triple: [Lake Pedder, operator, Hydro-Electric Commission of Tasmania]
  • A. Hydro Tasmania chosen
    Hydro Tasmania is Australia's largest producer of renewable energy, primarily generating hydroelectric power from Tasmania's extensive network of dams and power stations.
  • B. Snowy Hydro Limited
    Snowy Hydro Limited is an Australian electricity generation and retail company that operates the Snowy Mountains Hydroelectric Scheme and other energy assets.
  • C. Tasmanian power grid
    The Tasmanian power grid is the integrated electricity generation, transmission, and distribution network that supplies power across the Australian island state of Tasmania, heavily reliant on hydroelectric resources.
  • D. Manapouri Power Station
    Manapouri Power Station is a large underground hydroelectric power station in Fiordland, New Zealand, renowned for harnessing the waters of Lake Manapouri to generate electricity, primarily for the Tiwai Point aluminium smelter.
  • E. Snowy Hydro Scheme
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1355608190a6673ddb67231d54 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03e1749bc8190a8b9cbcb27288a5b completed April 16, 2026, 1:40 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff1a67adf88190bbe15040761d235e completed May 9, 2026, 11:28 a.m.
Created at: April 10, 2026, 3:17 a.m.