Triple

T1533847
Position Surface form Disambiguated ID Type / Status
Subject Moama E32505 entity
Predicate agriculturalRegion P24310 FINISHED
Object Murray irrigation district E28563 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Murray irrigation district | Statement: [Moama, agriculturalRegion, Murray irrigation district]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Murray irrigation district
Context triple: [Moama, agriculturalRegion, Murray irrigation district]
  • A. Murray Irrigation Area chosen
    The Murray Irrigation Area is a major agricultural irrigation district in the Riverina region of New South Wales, Australia, known for its extensive network of channels supplying water to broadacre farms.
  • B. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • C. Perris Dam
    Perris Dam is a large earthfill embankment dam in Riverside County, California, that forms Lake Perris as part of the state’s major water storage and distribution system.
  • D. Friant Dam
    Friant Dam is a major concrete gravity dam on California's San Joaquin River that provides irrigation water, flood control, and hydroelectric power as part of the federal Central Valley Project.
  • E. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: agriculturalRegion
Context triple: [Moama, agriculturalRegion, Murray irrigation district]
  • A. locatedInAgriculturalRegion chosen
    Indicates that an entity is situated within a region primarily characterized by agricultural activities or land use.
  • B. widelyCultivatedIn
    Indicates that something is grown extensively or on a large scale within a particular place or region.
  • C. arealRegion
    Indicates that something occupies or pertains to a specific two-dimensional geographic or spatial area.
  • D. culturalRegion
    Indicates that an entity is located in, associated with, or belongs to a specific cultural region or cultural area.
  • E. agriculturalPractice
    Indicates a relationship where an entity engages in, applies, or is associated with a specific method or technique of agriculture or farming.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ea86308190998f6bc14bb91f8e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a915f323bc8190aa757142c225e0ae completed March 5, 2026, 5:34 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad295a03d881909071fb437c2d19ba completed March 8, 2026, 7:46 a.m.
PD Predicate disambiguation batch_69a907b046448190be8ea4d7b20255f7 completed March 5, 2026, 4:33 a.m.
Created at: March 4, 2026, 7:26 p.m.