Triple

T15334039
Position Surface form Disambiguated ID Type / Status
Subject La Carolina E366613 entity
Predicate locatedOnTransportRoute P2409 FINISHED
Object Autovía A-4 E456409 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autovía A-4 | Statement: [La Carolina, locatedOnTransportRoute, Autovía A-4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Autovía A-4
Context triple: [La Carolina, locatedOnTransportRoute, Autovía A-4]
  • A. Autovía A-4 chosen
    Autovía A-4 is a major Spanish motorway that forms part of the main route connecting Madrid with the southern region of Andalusia, including cities such as Córdoba and Seville.
  • B. Autovía A-45
    Autovía A-45 is a major Spanish motorway in Andalusia that connects the cities of Córdoba and Málaga, serving as a key north–south transport corridor in the region.
  • C. Autovía A-7
    Autovía A-7 is a major Spanish Mediterranean coastal motorway that runs along the southern and eastern coasts, connecting numerous cities and tourist destinations.
  • D. Autovía A-6
    Autovía A-6 is a major Spanish motorway that forms part of the main road corridor linking Madrid with the northwest of the Iberian Peninsula.
  • E. Autovía A-2
    Autovía A-2 is a major Spanish motorway that forms part of the route between Madrid and Barcelona, facilitating one of the country’s primary east–west transport corridors.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a121520819093dcce999fdefe1a completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03e03c5f081908e4d14dbdbc7f7a6 completed April 16, 2026, 1:40 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff01ee7480819080133a9910a2bf52 completed May 9, 2026, 9:44 a.m.
Created at: April 10, 2026, 3:17 a.m.