Triple
T15321075
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Diama Dam |
E366290
|
entity |
| Predicate | isDownstreamOf |
P5956
|
FINISHED |
| Object | Manantali Dam |
E366289
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Manantali Dam | Statement: [Diama Dam, isDownstreamOf, Manantali Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Manantali Dam Context triple: [Diama Dam, isDownstreamOf, Manantali Dam]
-
A.
Manantali Dam
chosen
Manantali Dam is a large multi-purpose dam in Mali that plays a key role in hydroelectric power generation, irrigation, and flood control for the Senegal River basin.
-
B.
Massingir Dam
Massingir Dam is a large embankment dam on the Olifants (Lepelle) River in Mozambique, primarily used for irrigation, hydroelectric power generation, and water regulation.
-
C.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
D.
Umiam Dam
Umiam Dam is a major hydroelectric and water storage dam in Meghalaya, India, that created the scenic Umiam Lake and supports regional power generation, irrigation, and tourism.
-
E.
Itumbiara Dam
Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a121520819093dcce999fdefe1a |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e03dd460288190b5c41f0a0aeee949 |
completed | April 16, 2026, 1:39 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff01e9d14c8190bb095d6d5c8ffd6e |
completed | May 9, 2026, 9:44 a.m. |
Created at: April 10, 2026, 3:16 a.m.