Triple

T15306460
Position Surface form Disambiguated ID Type / Status
Subject Clearwell Caves E365911 entity
Predicate instanceOf P0 FINISHED
Object iron mine C29229 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: iron mine
Context triple: [Clearwell Caves, instanceOf, iron mine]
  • A. iron ore mine chosen
    An iron ore mine is an industrial site where iron-rich rock is extracted from the earth, processed, and prepared for use in steel production and other iron-based manufacturing.
  • B. coal mine
    A coal mine is an industrial site where coal is extracted from underground or surface deposits for use as fuel and raw material.
  • C. silver mine
    A silver mine is an industrial site where silver-bearing ore is extracted from the earth, processed, and refined into usable silver.
  • D. copper mine
    A copper mine is an industrial site where copper ore is extracted from the earth, processed, and refined for use in manufacturing and construction.
  • E. tin mine
    A tin mine is an excavation or system of workings where tin ore is extracted from the earth for processing and metal production.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a113ee881908e297a1d38dd79fa completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:16 a.m.