Triple

T15304736
Position Surface form Disambiguated ID Type / Status
Subject Interstate 84 in Sturbridge, Massachusetts E365870 entity
Predicate junctionNumber P44145 FINISHED
Object Exit 3 on I-84 (Massachusetts Turnpike / I-90)
Exit 3 on I-84 (Massachusetts Turnpike / I-90) is the highway interchange in Sturbridge, Massachusetts that connects Interstate 84 with the Massachusetts Turnpike (Interstate 90).
E1150587 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Exit 3 on I-84 (Massachusetts Turnpike / I-90) | Statement: [Interstate 84 in Sturbridge, Massachusetts, junctionNumber, Exit 3 on I-84 (Massachusetts Turnpike / I-90)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Exit 3 on I-84 (Massachusetts Turnpike / I-90)
Context triple: [Interstate 84 in Sturbridge, Massachusetts, junctionNumber, Exit 3 on I-84 (Massachusetts Turnpike / I-90)]
  • A. Massachusetts Turnpike (Interstate 90) in parts of Massachusetts
    The Massachusetts Turnpike (Interstate 90) is a major east–west toll highway crossing Massachusetts, connecting the New York state line to Boston and serving as the state’s primary long-distance travel and freight corridor.
  • B. Interstate 90 (Massachusetts)
    Interstate 90 (Massachusetts) is the Massachusetts segment of the east–west Massachusetts Turnpike, serving as the state’s primary cross-state highway and a major route between Boston and upstate New York.
  • C. Interstate 95 Exit 11
    Interstate 95 Exit 11 is a highway interchange on I-95 that provides access to the city of Emporia in southern Virginia.
  • D. Interstate 93 (via connecting roads in Boston)
    Interstate 93 (via connecting roads in Boston) is a major north–south highway serving the Boston metropolitan area and connecting with the Massachusetts Turnpike through a network of local interchanges and surface roads.
  • E. Interstate 95 exit 140
    Interstate 95 exit 140 is a highway interchange on I-95 that serves the Stafford area in northern Virginia, providing local access to regional and commuter traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Exit 3 on I-84 (Massachusetts Turnpike / I-90)
Triple: [Interstate 84 in Sturbridge, Massachusetts, junctionNumber, Exit 3 on I-84 (Massachusetts Turnpike / I-90)]
Generated description
Exit 3 on I-84 (Massachusetts Turnpike / I-90) is the highway interchange in Sturbridge, Massachusetts that connects Interstate 84 with the Massachusetts Turnpike (Interstate 90).
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Exit 3 on I-84 (Massachusetts Turnpike / I-90)
Target entity description: Exit 3 on I-84 (Massachusetts Turnpike / I-90) is the highway interchange in Sturbridge, Massachusetts that connects Interstate 84 with the Massachusetts Turnpike (Interstate 90).
  • A. Massachusetts Turnpike (Interstate 90) in parts of Massachusetts
    The Massachusetts Turnpike (Interstate 90) is a major east–west toll highway crossing Massachusetts, connecting the New York state line to Boston and serving as the state’s primary long-distance travel and freight corridor.
  • B. Interstate 90 (Massachusetts)
    Interstate 90 (Massachusetts) is the Massachusetts segment of the east–west Massachusetts Turnpike, serving as the state’s primary cross-state highway and a major route between Boston and upstate New York.
  • C. Interstate 95 Exit 11
    Interstate 95 Exit 11 is a highway interchange on I-95 that provides access to the city of Emporia in southern Virginia.
  • D. Interstate 93 (via connecting roads in Boston)
    Interstate 93 (via connecting roads in Boston) is a major north–south highway serving the Boston metropolitan area and connecting with the Massachusetts Turnpike through a network of local interchanges and surface roads.
  • E. Interstate 95 exit 140
    Interstate 95 exit 140 is a highway interchange on I-95 that serves the Stafford area in northern Virginia, providing local access to regional and commuter traffic.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a113ee881908e297a1d38dd79fa completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e03ccef14c819099c5ebe962e7f867 completed April 16, 2026, 1:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69fef89d961481909be8dcc2864982c9 completed May 9, 2026, 9:04 a.m.
NEDg Description generation batch_69fefa339f988190b470e052c853e4f8 completed May 9, 2026, 9:11 a.m.
NED2 Entity disambiguation (via description) batch_69fefac48df08190ad58e9d455546a57 completed May 9, 2026, 9:13 a.m.
Created at: April 10, 2026, 3:16 a.m.