Triple
T1530159
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zambezi Valley |
E32420
|
entity |
| Predicate | near |
P350
|
FINISHED |
| Object | Cahora Bassa Dam |
E70573
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cahora Bassa Dam | Statement: [Zambezi Valley, near, Cahora Bassa Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Cahora Bassa Dam Context triple: [Zambezi Valley, near, Cahora Bassa Dam]
-
A.
Cahora Bassa Dam
chosen
Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
-
B.
Yacyretá Dam
The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
-
C.
Angostura Dam
Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
-
D.
Cahora Bassa Gorge
Cahora Bassa Gorge is a steep, narrow section of the Zambezi River in Mozambique, known for its dramatic scenery and the nearby Cahora Bassa Dam and reservoir.
-
E.
Itaipu Dam
Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ea86308190998f6bc14bb91f8e |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69a908156b888190968ca0157ae42bc7 |
completed | March 5, 2026, 4:35 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad2957e6e4819087504a16bc32d60b |
completed | March 8, 2026, 7:46 a.m. |
Created at: March 4, 2026, 7:26 p.m.