Triple

T1530159
Position Surface form Disambiguated ID Type / Status
Subject Zambezi Valley E32420 entity
Predicate near P350 FINISHED
Object Cahora Bassa Dam E70573 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cahora Bassa Dam | Statement: [Zambezi Valley, near, Cahora Bassa Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cahora Bassa Dam
Context triple: [Zambezi Valley, near, Cahora Bassa Dam]
  • A. Cahora Bassa Dam chosen
    Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
  • B. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • C. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • D. Cahora Bassa Gorge
    Cahora Bassa Gorge is a steep, narrow section of the Zambezi River in Mozambique, known for its dramatic scenery and the nearby Cahora Bassa Dam and reservoir.
  • E. Itaipu Dam
    Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ea86308190998f6bc14bb91f8e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a908156b888190968ca0157ae42bc7 completed March 5, 2026, 4:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad2957e6e4819087504a16bc32d60b completed March 8, 2026, 7:46 a.m.
Created at: March 4, 2026, 7:26 p.m.