Triple
T15300999
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Route 68 (Chile) |
E365787
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Chilean national route |
C22442
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Chilean national route Context triple: [Route 68 (Chile), instanceOf, Chilean national route]
-
A.
Chilean road
chosen
A Chilean road is a transportation route within Chile’s national or regional network, designed for vehicular travel and identified by a specific classification and numbering system.
-
B.
ley chilena
Ley chilena es el conjunto de normas jurídicas vigentes en Chile que regulan la convivencia social, los derechos y obligaciones de las personas, y la organización del Estado dentro de su territorio.
-
C.
region of Chile
A region of Chile is a first-level administrative division of the country, each with its own capital, government authorities, and distinct geographic, economic, and cultural characteristics.
-
D.
Commune of Chile
A Commune of Chile is the smallest administrative subdivision in the country, functioning as a local government unit typically comprising a city or town and its surrounding rural areas, administered by a municipal council and mayor.
-
E.
trans-Andean railway
A trans-Andean railway is a rail line that crosses the Andes Mountains, connecting regions or countries on either side of the range to facilitate transportation and trade.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a113ee881908e297a1d38dd79fa |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:15 a.m.